Skip to content

Monday to Friday, 8:00–14:00 and 16:00–18:00

Emergency? Call 661 57 50 83
Grupo Renova

Guide · Updated 2026

Building permits in Granada: what your renovation needs

Before starting any building work in Spain it pays to know what the town hall will ask for. In Granada there are, in practice, two routes: the declaración responsable and the building licence. Here is when each applies.

Declaración responsable: most interior renovations

Under Andalusia's planning law (LISTA, 2021), works that don't affect the structure or change the use of the property are processed with a declaración responsable — a sworn statement filed with the town hall. You submit it with the required documents and can start; the town hall checks afterwards.

A declaración responsable is usually enough for:

  • Renovating a bathroom or kitchen without touching load-bearing walls.
  • Replacing floors, wall tiles, ceilings or internal doors.
  • Renewing plumbing and electrics.
  • Painting and minor interior repairs.

Building licence: structure, extensions and new builds

You need a licencia urbanística, with a project signed by an architect or building engineer, when the work:

  • Affects the structure: load-bearing walls, floors or beams.
  • Increases the floor area or volume: an extra storey, enclosing a porch or terrace.
  • Is a new house or a demolition.
  • Changes the use, for example from commercial premises to a home.

Licences take longer, so apply early and don't fix the start date until you have it.

Albaicín, Realejo and the historic centre

Much of central Granada, the Albaicín, the Sacromonte and the Realejo are protected as a historic site. There, work that affects the exterior (facade, roof, windows, balconies, colours) or protected features also needs heritage approval before the licence or declaración. There are specific rules on materials, colours and joinery, and timescales are longer. More about renovating in the Albaicín →

What you pay

  • Construction tax (ICIO): a percentage of the construction budget, set by each town hall.
  • Planning fee for processing the application.
  • Public highway occupation if a skip or scaffolding goes on the street, with its own permit.

Each town around Granada (Armilla, Maracena, Las Gabias…) has its own by-laws and fees, although the process is the same.

Frequently asked questions

Do I need a permit to redo a bathroom or change the floors?

Usually you don't need a full licence, but you do need to file a declaración responsable with the town hall before starting. It is quicker: you submit it and can begin work.

What happens if I renovate without the right permit?

The town hall can stop the works, issue a fine and require you to legalise or undo them. It can also cause problems when selling the property or with your insurance.

Do I need my neighbours' permission?

Not for work inside your own property that doesn't affect shared elements. If the work affects the facade, the structure, shared drains or the exterior appearance, you need the agreement of the owners' association (comunidad de propietarios).

Tell us about your project

Send us a few photos and rough measurements on WhatsApp and we'll give you a first idea of the cost. Then we'll come and see it, with no obligation.

WhatsApp

Emergency

A leak or damage that can't wait?

Leaks, burst pipes, falling plaster, cracks that keep growing… Call us and we'll tell you straight away what to do and when we can be there.

Call now · 661 57 50 83 Urgent WhatsApp (send photos)

If anyone is in danger, call 112 first.